Projects and news

Innovative Equipment for Automatic Sampling

At Cim Aigua, we provide our clients with equipment for the integrated sampling of wastewater, with the aim of understanding the quality of wastewater and its variations over time. This is a significant aid in water management during treatment processes.

Read more »

A gateway to wastewater reuse

In an era of water restrictions and regulatory changes due to drought episodes, CIM AIGUA is proposing a water treatment system that improves conventional biological treatment facilities or SBR and aims to promote the reuse of industrial water.

Read more »

Turnkey project for the construction of a thickener and a sludge centrifugation treatment house in a Potable Water Treatment Station (ETAP, in Spanish)

Next April we are going to carry out the commissioning of a turnkey plant, which we have been building for the last 6 months: a sludge thickener and the sludge dewatering treatment of an ETAP in Osona. This project has included the design, supply of equipment and materials, assembly and also programming by remote connection (via PLC and HMI).

Read more »

Process water treatment plant for the regional food industry

Last August we started up a process water treatment plant for a ready-made food factory in the area of Bages. It is a turnkey project and, therefore, we have taken care of the design, the supply of materials and equipment, the assembly and the validation. The scope of the installation goes from the municipal network water connection to the treated water tank, including the pressure group for the internal network of the factory.

Read more »
No more posts to show
Scroll to Top